Skip to content
SME Search Search Results

Displaying 71-80 of 1219 results for

Additive Manufacturing & 3D Printing clear Cybersecurity clear Software clear Grinding & Deburring clear Finishing & Coatings clear

Intuitive Workflows Speed Product Development

Manufacturing Engineering: What are some of the latest trends in simulation software for manufacturing? Uwe Schramm, CTO, solvers, optimization and multi-physics, Altair Engineering Inc., Troy, Mich.: I see three trends here. First, manufacturing sim

Micro Manufacturing Keeps Shrinking the Envelope

Micro components continue to shrink in size, demanding ever-greater precision and improved handling of parts with sub-micron-sized features. New approaches in micro machining technology include higher-precision systems from traditional micro machining developers, as well as techniques using additive manufacturing processes and semiconductor wafer-scale technology on the smallest of micro parts.

Time for Monumental Thinking in Additive

As additive manufacturing emerges from a long infancy, the industry is grappling with a key challenge: A file format and design tools from the 20th century are being asked to do 21st century jobs.

Quality Inspection and the CAD Connection

Modern manufacturing is rapidly adopting model-based definition (MBD). When employing an MBD strategy, the CAD model becomes more than the nominal to which all parts are measured and inspected against. MBD keeps the all-important digital thread intact—from design to manufacturing to inspection and quality reporting.

Metrology Gets Connected

“Metrology and its relationship to manufacturing is rapidly evolving,” Ken Woodbine, president, Wilcox Associates, a brand of Hexagon Metrology (North Kingstown, RI), recently observed. “We are seeing larger quantities and faster speeds of measurement data collection. The next challenge is what to do with all that data.”

Grinding Roots

Until the middle of 2010, first-tier subcontract machinist, JJ Churchill, could produce turbine blades only if they had their fir-tree root-forms preground elsewhere, or if they were subsequently added by another subcontractor. No longer is this the case.