Controls Stay informed with the latest insights, news, resources and products in Controls to improve your manufacturing career and operations. controls, control manufacturing, controls and
SME interviewed at FABTECH Greg Morehouse. He is the Executive Vice President for operations, Acieta, a leading RIA certified and FANUC Authorized System Integrator. This podcast describes how Acieta defines custom automation and how one should approach the task of engaging an integrator like Acieta in procuring an automation system, whether your shop has three people or 300.
In this podcast, Bruce Morey, Senior Technical Editor for Manufacturing Engineering Magazine discusses collaborative robots, or cobots, with Steve Apel. He is a Regional Automation Manager for Acieta. In this role, he helps solve customer challenges through the adoption of new robotic automation technologies.
A package for control and optimization of rotary axes performance.
The Measuring Division of Kaman Precision Products, Inc. announces the availability of its line of Extreme Environment high-precision displacement sensors and systems.
The U.S. auto industry has been automated for decades. Production of cars and trucks is associated with large, hulking robots fenced off from human employees. Inside those fenced off areas, tasks such as welding are performed. The industry, though, is advancing on the automation front.
Horizontal machining centers (HMCs) are versatile four-axis and, increasingly, five-axis machine platforms that maximize processing of multi-sided large parts by minimizing part handling.
Adaptive Milling. Dynamic Motion. hyperMILL. Profit Milling. VoluMill. Waveform machining. If you’re one of the lucky people who machines parts for a living, chances are about 50-50 that you’re using one of these or a comparable high-performance programming technology.
In a perfect CNC world, the first part is always a good one. There’s no need for extra blanks or barstock. Setup times are only as long as is needed to swap out a few tools and load a new program. There’s never a crash, never the need to reprogram an inefficient bit of code. The operator just pushes the green button and out pops a finished workpiece minutes or hours later.
I just returned from IMTS in Chicago and my first thought was, “where will I be able to rack up all those bonus steps I got last week?” On the easiest day, I walked 7.9 miles, and I topped 10 miles on two other days. It’s easy to understand why.